国产用力吃奶精品夜夜夜|色欲久久精品亚洲秘一区二区|精品欧美亚洲精品|少妇裸体婬交视频免费看高清

濟南誠耐金屬制品有限公司

濟南誠耐金屬制品有限公司

不斷發(fā)展技術(shù)力量、完善的設(shè)計服務(wù)團隊,真誠為您提供的服務(wù)

咨詢熱線
于經(jīng)理15194166167
15990909037

聯(lián)系我們

企業(yè)名稱:濟南誠耐金屬制品有限公司

聯(lián)系人:于經(jīng)理

電話: 15990909037

電話: 15194166167

地址:山東省濟南市歷城區(qū)小清河南路8288號

當(dāng)前位置:首頁 »資訊中心 » 新聞資訊裝配式電梯門套養(yǎng)護要注意什么?

裝配式電梯門套養(yǎng)護要注意什么?

來源:http://www.zjy168.com/ 瀏覽:0發(fā)表時間:2023-07-12
對于裝配式電梯門套除了正確的選購、安裝以外,還要做好相應(yīng)的養(yǎng)護措施,這對門套線的使用影響是很大的,尤其是它的使用壽命。
For prefabricated elevator door covers, in addition to proper selection and installation, corresponding maintenance measures should also be taken, which has a significant impact on the use of the door cover line, especially its service life.
在維護的過程中,應(yīng)該主要保持裝配式電梯門套的干燥,遇到陰雨天氣,一定要采取方法保護,以免門套線因發(fā)霉而影響工程質(zhì)量。但也不能過度的干燥,所以在使用中應(yīng)盡量避免陽光的暴曬,盡量放在室內(nèi)進行存放,以免長時間受陽光暴曬,因為長期在陽光下直接暴曬的話門套線會出現(xiàn)老化、開裂等現(xiàn)象。
During maintenance, it is important to maintain the dryness of the assembled elevator door cover. When encountering rainy weather, measures must be taken to protect the door cover line from mold, which may affect the quality of the project. But it should not be excessively dry, so during use, it is advisable to avoid direct sunlight exposure and store it indoors as much as possible to avoid prolonged exposure to sunlight, as prolonged exposure to direct sunlight can lead to aging, cracking, and other phenomena on the door cover line.
臨沂電梯門套上門安裝
如果裝配式電梯門套上有油污,可用抹布蘸溫水沾少量洗衣粉擦洗,若是顏料,必須在污跡末滲如木質(zhì)表層以前加以;盡量避免與水長時間接觸,特別是不能與熱水接觸,若有則要及時擦干。
If there is oil stains on the assembled elevator door cover, it can be wiped with a cloth dipped in warm water and a small amount of laundry detergent. If there is paint, it must be removed before the stains seep into the wooden surface; Try to avoid prolonged contact with water, especially hot water. If there is contact, it should be wiped dry in a timely manner.
安裝流程
Installation process
基層墻面處理→墻面鉆孔踢槽→放鍍鋅鉛絲或銅絲→鋼絲網(wǎng)連接→拼裝→打線→大理石板材安裝固定→灌漿→清縫→整體清潔→綜合檢查→驗收
Grassroots wall treatment → Wall drilling and grooving → Placing galvanized lead or copper wire → Steel wire mesh connection → Assembly → Wiring → Installation and fixation of marble panels → Grouting → Joint cleaning → Overall cleaning → Comprehensive inspection → Acceptance